(512) 555-0148

A new roof, installed in one day

Most Austin roofs we replace are finished in a single day by one Hartline crew, from tear-off to cleanup. You choose from three fixed-price options after a drone and attic inspection, and the work carries a lifetime workmanship warranty.

Call (512) 555-0148

What's included

  • Full tear-off down to the deck
  • Decking replacement at a listed per-sheet price
  • Synthetic underlayment and valley leak barrier
  • New drip edge, flashing and pipe boots
  • Balanced attic ventilation
  • Magnetic sweep, haul-off and photo report

How long a roof really lasts in Central Texas

Asphalt shingles are often sold as 25 to 30 year products, but Central Texas shortens that. On a dark roof in August, deck temperatures can pass 160 degrees, which bakes the oils out of shingles and leaves them brittle. Add a hail season that runs roughly March through June and steady wind across the hills west of MoPac, and many Austin roofs need replacing at 15 to 20 years.

Age alone is not the deciding factor. We look at granule loss, cracked or lifted tabs, soft decking, failed pipe boots and how well the attic breathes. If a repair will honestly buy you several more years, the written report says so, and we will quote the repair instead.

What changes when a roof is built for this climate

The shingle is only one layer. A roof that lasts here starts with synthetic underlayment, a leak barrier membrane in valleys and around penetrations, new drip edge, and fresh flashing where the roof meets limestone, brick or stucco walls. We balance intake and exhaust ventilation so the attic sheds heat instead of cooking the deck from below.

On most homes we recommend Class 4 impact-rated shingles. They hold up better to hail, and many Texas insurers offer a premium discount for them, so the upgrade can partly pay for itself over the life of the roof. Ask your agent what your carrier offers before you choose, and we will send them the documentation.

What a one-day replacement looks like

Your crew arrives around 7 AM, tarps the landscaping and protects the pool, patio and driveway. Tear-off and a deck inspection come first. Any soft or rotted plywood is replaced at the per-sheet price printed in your proposal, so there are no open-ended surprises. Installation runs through the afternoon.

Before the crew leaves, they run a magnetic sweeper over the yard and driveway twice, haul away every scrap and walk the roof with your project manager. You receive a photo report of the finished roof and your warranty registration within the week. Very large or steep homes, tile tear-offs and metal systems take two to four days, and we tell you that before you sign.

How to know you need this.

If any of these sound familiar, a free inspection will tell you for sure, with photos.

  1. 01

    Your shingles are 15 or more years old

  2. 02

    Granules collect in gutters or at downspouts

  3. 03

    Tabs are curling, cracked or missing

  4. 04

    Stains appear on ceilings or attic decking

  5. 05

    Recent hail left bruises or exposed mat

Three clear choices.

Every proposal comes with good, better and best options, each with one fixed price. No surprises later.

Essential

A clean, correctly built architectural shingle roof at our lowest fixed price.

  • Architectural shingles in 30 colors
  • Synthetic underlayment throughout
  • Lifetime workmanship warranty
Most chosen

Impact

Class 4 impact-rated shingles with upgraded components, the option most Central Texas homeowners choose.

  • Class 4 impact-rated shingles
  • Leak barrier in valleys and at walls
  • Paperwork for a possible insurance discount

Signature

Designer impact-rated shingles with reflective granules and a full ventilation upgrade.

  • Designer profile with cool-roof granules
  • Continuous ridge vent and intake upgrade
  • Manufacturer system warranty up to 50 years

From first call to final walkthrough.

  1. 01

    Inspect

    Drone and attic photos with a written report, at no cost.

  2. 02

    Choose

    Three options, each with one fixed price and no pressure.

  3. 03

    Install

    One Hartline crew, usually one day, with full cleanup.

  4. 04

    Walk through

    A final review with your project manager and warranty registration.

What roof replacement customers say.

From our Google Business Profile. Read all 1,940

Reviews
4.9Based on 1,940 reviews
Review us on Google
P
Priya RamanAustin · 2 weeks ago
Roof replacement

Carmen walked us through three options with real photos of our own roof, not a sales binder. We picked the Class 4 shingles. Esteban's crew started at 7, were gone by 5, and the yard was cleaner than before they came. Our insurance agent took the discount paperwork without a single question.

Response from the owner

Thank you, Priya. Carmen and Esteban's crew loved working on your Allandale home, and we're glad the discount went through smoothly.

B
Beth Ann CrowleyGeorgetown · 2 months ago
Roof replacement

I am in Sun City and was worried about the noise and the mess. The crew lead introduced himself, told me exactly when the loud part would end, and he was right to the hour. They swept the lawn twice with a magnet. My neighbors have already asked for the number.

W
Wes PruittLakeway · 5 months ago
Roof replacement

Walt Hartline did my first roof in 2004. Brody's team did this one. Same straight talk, same clean job. The written report from the inspection was better than the one I got when I bought the house. That is why I did not bother getting other bids.

Questions, answered.

How much does a roof replacement cost in Austin?

Most Austin homes we replace land between $14,000 and $32,000 for architectural or Class 4 shingles. The main drivers are roof size, pitch, the number of layers to remove, and how many valleys and penetrations the roof has. Metal and designer shingles run higher. Your proposal lists three options at one fixed price each, so the number you sign is the number you pay unless you add work.

Do I need a permit or HOA approval to replace my roof?

Many cities in our area require a permit for a full replacement, and most HOAs require architectural approval for any color or material change. We handle the city permit on every job and prepare the HOA submittal for you with color samples and spec sheets, so all you need to do is sign it and send it in.

Do you use subcontractors?

No. Every Hartline roof is installed by a Hartline crew. We employ 140 people, including our installers, and each crew is run by a lead who has worked with us for years. That is the reason we can offer a lifetime workmanship warranty: we know exactly who did the work, and we stand behind it for as long as you own the home.

Can I stay home during the replacement?

Yes, most families do. The loudest part is tear-off, usually the first three to four hours, so people who work from home often plan to be out that morning. Keep pets inside or with a friend, move cars out of the driveway, and take fragile items off walls that share the roof line, since hammering can shift them.

Let's take a look at your roof.

A free inspection with drone and attic photos, and a written report you keep.

Call (512) 555-0148
RSample site by Revcore← Back to Revcore